Skip to content
Architecture news, design, cities, competitions and the built environment.
News

London Museum opens in Smithfield’s transformed market buildings

The London Museum opens to the public on 28–29 November in a first phase that adapts Smithfield’s historic market buildings for exhibitions and civic use.

News Published 24 November 2026 4 min read Mara Ellison
The London Museum’s new entrance in the transformed Smithfield Market buildings in London.
Imagen destacada del articulo fuente

The London Museum is due to open to the public on 28–29 November 2026 in the first phase of its move to Smithfield, adapting historic market buildings for exhibitions and public use. The project brings together work by Stanton Williams, Asif Khan and conservation specialist Julian Harrap Architects across a site of about 33,000 square metres.

The former Museum of London, previously at London Wall, is relocating to the western end of the City’s cultural axis. Its new setting comprises two market buildings—a Victorian structure and a 1960s building—connected by a former market lane that now serves as the museum’s main entrance. The opening is a staged launch: the poultry market is expected to form part of a later phase.

A museum shaped by its buildings

The redesign treats the market complex as part of the visitor experience, rather than simply as a container for displays. Stanton Williams led work on the poultry market, basement galleries and covered street between the market buildings. Asif Khan’s work focused mainly on the General Market’s above-ground interiors and exterior, including public areas, upper floors and entrances, in collaboration with Julian Harrap Architects.

The buildings also provide a record of the site’s earlier uses. Beneath the General Market, underground chambers contain brick jack arches around seven metres high. The source account describes these spaces as former goods yards, where cargo arriving by rail and river was stored before the market was built above them. The galleries bring these previously partly concealed spaces into the museum route.

The approach places adaptive reuse at the centre of a major public cultural project: existing structures are being refitted for a new purpose while retaining visible traces of their industrial and commercial past.

A first phase, not the finished campus

The November opening covers only the first stage of a longer transformation. The poultry market is intended to be taken over in a later phase, so the museum’s full future configuration is not yet open to visitors.

The project also includes a proposal to reorganise 48 historic shop units into 12 “houses”. According to Wallpaper’s account, six would be for the museum and six for external ventures selected by the institution. The arrangement is presented as an incubator for a mix of organisations, but the available material does not specify which ventures will occupy the spaces or when they will open.

That distinction matters for visitors and for practitioners following the project: the opening offers a first view of the adapted site, not a completed account of every intended use.

Key facts

Detail Information
Public opening 28–29 November 2026
Location Smithfield, London
Project area About 33,000 sq m
Project teams named Stanton Williams, Asif Khan and Julian Harrap Architects

A civic role alongside the displays

Stanton Williams principal director Paul Williams described the museum as a place that can help people make sense of a changing city and provide shared civic space. That is the project’s stated ambition; how visitors use the new spaces will become clearer after opening.

The design also aims to accommodate change. Wallpaper reports that Khan described adaptability as built into the architecture. For a museum housed in repurposed market buildings, that ambition connects the site’s layered history with the possibility of changing exhibitions and uses.

For architecture readers, the project offers a substantial London example of a public institution taking over an existing complex rather than starting with a new-build site. The opening will make the first-phase approach tangible, while the later conversion of the poultry market and the planned shop-unit programme remain important parts of the wider scheme.

What to look for at opening

Visitors can see how the former market lane has been made into an entrance, how the museum links above-ground public spaces with the basement galleries, and how historic fabric is incorporated into the route. The vaulted chambers are among the clearest examples of the building itself becoming part of the display.

The November dates refer to the public opening reported by Wallpaper. The supplied information does not include visitor arrangements, ticketing details or a full schedule for later phases; those should be checked through the museum’s official channels before planning a visit.

Source: Wallpaper, “Discover the ‘soft power’ of the London Museum as it reveals its new home”: https://www.wallpaper.com/architecture/public-buildings/london-museum-opens-uk

Source

Wallpaper Original publication: 2026-11-24T00:01:00+00:00